The Vue site, the upper site on
Kendall Street Gosford. This is one of the fastest moving sites in Gosford.
With materials deliveries and concrete pouring trucks and other vehicles coming
and going all day, this site is hard to photograph at the moment. But it will
soon be rising up high enough that I can get clear shots every week.
Stacks of materials in the
foreground, ground floor (US 1st floor) walls atop the basement and
the scaffolding is going up now too.
Scaffolding still under
construction on the southern end of the Vue site.
Extra
Two roundabouts (traffic
circles) away from Kendall Street, Baker Street was closed at the Donnison
Street east corner while the footpath (sidewalk) and road were sawed through by
a very loud ride-on circular saw. New pipes are to be laid under the road.
No comments:
Post a Comment
Be nice.