Where are the Local Listings?

Where are the Local Listings? They're on my new website Locally Owned Locally Made Gosford at lhttp://locallygosford.blogspot.com.au/.


Feedback made urgent the moving of the Local Listings to the new site, so they can flourish without having to be hunted down on this site.

Locally Owned Locally Made Gosford
will have live links to businesses websites and business phone numbers for tradespeople and others who don’t need websites. When I first go live, I’ll be putting up some live links and phone numbers for free until I have things sorted out and I’m ready to charge (standard) pay-per-click rates. Enjoy!
Showing posts with label Showground Road. Show all posts
Showing posts with label Showground Road. Show all posts

Monday, 17 September 2018

Sunday Round-up

A very quick update today. Too much work going on in the rest of my life to get to the sites on Saturdays. Will have to work something out there.


Old quarry site at John Whiteway Drive, 16th September 2018
This is what remains of the old Gosford quarry. It sits atop the hill encircled by the upper and lower parts of John Whiteway Drive. You can get there from the easternmost end of Donnison Street. There's also a map showing it in Kibble Park, on the side of that little kiosk thing. Put "old quarry on gosford hill" into Google for lots of images of this and the other active and inactive Gosford Quarry sites around the Gosford area.

This site has been fenced for as long as I can remember and I've lived in Gosford for 20 years. But the materials and equipment on the site now suggest something is finally going to happen in the way of building. Whatever it is, the views from this site will be magnificent.


Riou Street, opposite the railway station, 16th September 2018
A hard to photograph site, on Riou Street opposite Gosford railway station. They're going ahead gangbusters with digging down and getting the cage in. Why does this site need bracing in the corner? Anonymous explanations welcome in the comments box below.


Risen up fast on the big hospital site at Beane Street West, 16th September 2018
My white whale is getting much easier to photograph now its building have risen so far up. This is the site that covers Beane Street West. Its bottom edge is on Showground Road (shown here) and its top edge in on Holden Street, right across the road from the currently blocked-off emergency entrance to the hospital.

Beane Street East site, seen from Riou Street, 9th September 2018
The Beane Street East site, opposite the Beane Street West site, has been going ahead well. It's gained another 4 stories and is nearly the same height as the other new apartment buildings in Hills Street. (It's on the corner of Beane Street East and Hills Street.)


Movement at last on Henry Parry Drive, 16th September 2018
This site on Henry Parry Drive has been at this stage for about 12 years. Its inactivity has been one of the great mysteries of 21st century Gosford.


In that 12 years, a small forest has grown on site, 16th September 2018
In that 12+ years, a small forest of casuarina (she-oaks) has grown up on the site.


Pipes & tracks as seen from Henry Parry Drive, 16th September 2018
Pipes sticking out of the ground, tracks of the tamper-downer vehicle and, in the foreground, a bit of the casuarina forest.


Tamper-downer on site & Henry Parry Drive behind, 16th September 2018
The tamping-down machine, the gate open and a ute parked in the access driveway (could not see the site visitor) and, in the background, Sunday afternoon traffic on Henry Parry Drive.


Frederick Street site, 16th September 2018
A new site that opened on Frederick Street in East Gosford. The view from here, when the building is finished, will be of Kariong Ridge (visible in distance) and Fagans Bay and the Gosford foreshore. From Frederick Street to the main street of Gosford is a 20 - 30 minute walk up and down the little hills of Henry Parry Drive. Very good for strong, shapely legs.


That will have to do for today. It's back to the grindstone for me. More round-up later this week and a Crane Count too, with cranes going up and cranes going down.

Tuesday, 24 July 2018

Topped out

 32 Mann Street

32 Mann Street site, 18th July 2018

The finance building at 32 Mann Street has topped out. Congratulations, gentlemen!



The site sits on part of the old primary school site, which we can more of here, and the materials and equipment are still stacked up there as finishing work goes on at the site.



Just for pretty. The goods lift silhouetted against the sky on a cold winter Wednesday.


 Lynne Avenue


Lynn Avenue's second site, the Central Real one, has topped out. Congratulations, gentlemen!

There is another Central Real site immediately behind this one and another immediately behind that one, on the corner of Albany Street and Duke Street Point Frederick. So there's plenty more work for all concerned.
 



 In this photo we can see the top floors at Lynn Avenue will have bigger balconies than those below. But all will be just 30 seconds strolling distance to the yacht club and the Gosford foreshore and a nice bit of exercise, 20 minutes' walk, to Gosford main street.


 Tiny houses



This is Bluey is the front-most of the tiny houses, on the 21st of July 2018.

The tiny houses topped out about a month ago and their residents moved in before the really freezing overnight temperatures came.

Congratulations, students, and congratulations, residents of these delightful tiny houses! These are Gosford's first tiny houses and it will be interesting to see if they are the last or if more are to come.



Mellow Yellow here is another of the 4 tiny houses. The other 2 are Lovely Lilac and Dove Grey. The 5th building on the site is the communal laundry. See here for clearer photos than the nice paling fence now allows.


 Extra



From what I can make out, this old railway water tank at Gosford station dates back to the days of steam. The steam trains started coming through Gosford, doing the Sydney to Newcastle run, in 1887 and steam is made from water, hence the need for water tanks so trains could refill at various points along the line.

According to Wikipedia "the water crane...is used occasionally by passing steam locomotives". Now they mention it, I recently saw the steam locomotive 3801 chuffing up the line towards Gosford.

Train spotters and railway workers, feel free to chime in in the comments box if I've got something wrong or you'd like to add some nice Sydney-Newcastle line info.

The same applies to all building site owners, managers, workers, apartment buyers and tiny house residents.


Hopefully next week's post will be on the day I say it will be but don't put your shirt on it!

Monday, 2 July 2018

White whale, Singo, Lynne Avenue & WWII

 The view from afar

6 of Gosford's cranes visible from Pt Clare station, 29th June 2018
Today we're starting with an overview of the town. In this photo, only 6 of Gosford's cranes visible but there are currently more than double that many cranes working in Gosford. The photo was taken on the 29th of June 2018 from beside Point Clare railway station.

The next Crane Count and map are coming in July 2018.


 Bonython Tower AKA Singo's tower

Bonython Tower from Mann St footbridge, 9th of June 2018
Between the flu and the weather, this is as good a photo of Mann Street as I've been able to snap recently. Taken on the 9th of June 2018.

The angle makes the Bonython Tower look quite small but it's at least twice the height of the building in the left foreground.


Bonython Tower from Mann St footbridge, 9th of March 2018
What a difference 3 months has made! In this photo, the tower was unnoticed by some people. Now, as it is in the photo above, everyone stops and stares at it every time they go into Gosford.

(Singo workers, I'll be back for my more usual snaps of your site when I've caught up with all the other Gosford sites.)


 Lynne Avenue

Lynne Avenue site nearing topping out, 25th June 2018
Not long now, gentlemen. The Lynne Avenue site was close to topping out on the 25th of June 2018. And the weather in this photo is the ideal weather for building site photography: nice and dry for both photographer and workers. Pity it's not the same again today.


 White whale sighted at last


Hospital site between Holden Street & Showground Road, 9th June 2018
The hospital's Beane Street West building site. The blue-metalled access lane stretching up from the foreground to the back of the site is where Beane Street West used to be.

In the middle of the photo, on the right, we can see the construction itself going gangbusters at last, after months of earthmoving and foundation work on this tricky hill site. Right up the top, up past the curve of white and orange barriers and the earthmover still hard at work, we can see the tops of existing hospital buildings, near the emergency entrance of the hospital on the western side of Holden Street.

Hospital site between Holden Street & Showground Road, 9th June 2018
Due to flu versus weather versus traffic, I had to take these 3 snaps of the hospital site on a Sunday. I prefer photos with workers in them but photo access to this site has been a photographer's nightmare.

Workers' access is not much better and, with so much equipment stored within the fence and the buildings going up starting to crowd the site, I think you're going to have an even bigger squeeze soon. Good luck with it.


 Extra

Old Nissen hut in Miller Street Ourimbah, 9th June 2018
And now for something completely different: an old world War II Nissen hut on the edge of the university campus in Mills Street Ourimbah.

During the war, the land the university now sits on was used as a military training ground and there are a few remnants of that military installation still to be seen. There is another Nissen hut nearby, in a side street on the other side of the railway line. I'll add it when I spot it.


Okay, that's it from me for today. There's a pile of work waiting on my desk for me. I'll put some more photos up later this week and the Crane Count and it's new map will come this month too.

Tuesday, 13 March 2018

Kendall Street Gosford

 Icon 


The Icon site in Kendall Street still powering ahead, 12th March 2018

The Icon site had 5 floors on the 28th of February 2018 and now has 6 floors. Frankly, with the crowding in this street, a narrow old street with a steep drop-away on the Gosford side, I'm surprised work on Icon and Vue goes ahead as fast and steadily as it does.

Today there's no photo of deliveries and workers at the other end of this site, due to an access issue at the time.


 Vue


Crane footings locked in on the Vue site, 12th March 2018

Crane footings locked and loaded and ready for the crane that will lift the big loads materials into this site. When it’s up, this crane will make two cranes, one on each site, in this quite short street on the hillside on the west side of the small narrow town that is Gosford. Things are changing so fast in our little town.


Lighter spoil being removed at the front of the site, 12th March 2018

The lighter loads of spoil, the ones with the smaller rocks, still being loaded into dump trucks at the front of the site. I was passed by 4 dump trucks leaving the site in the 5 minutes it took me to walk to it.


Digging down at the back of the site, 12th March 2018

At the back of the site, there was a deep juddering noise as this earthmover scraped into the ground with its teeth to break it up. Spending all day in the cab of this earthmover, with that juddering a part of the job, must be very wearing and I don't imagine it's much fun for anyone else on or near the site. I was very glad to get away from it.


Big boulders being loaded into a dump truck, 12th March 2018

And what was in that ground at the back was some very big rocks. The driver for the lighter spoil stayed in his cab during loading. But this driver very wisely got out. From where I stood, I could see the massive impact of each big rock dropping into the tray of the truck.


 Extra


I am slowly but surely putting together a list of all the locally owned businesses and locally made goods on the NSW Central Coast. Listings are free and will go online, on this website and on Locally Owned Locally Made Gosford.

By 'locally' I mean living locally, on the NSW Central Coast, if you are a tradie or business owner and made locally if you are supplying goods and/or services.

If you are a local tradie, local business owner, or supplier of locally made goods, please email me your business contact details to be included in my free listings. The only catch is that it's for LOCALS ONLY.


 Extra extra












Showground Road demolition has begun, 12th March 2018

Demolition starting on the two old houses opposite the railway station on Showground Road. The house under demolition is partly obscured by the palm tree. The station can be seen along the bottom half of this photo.

This site now being active makes 10 active building sites in the 5 minute drive from Fielder Street in West Gosford to Lynn Avenue in Point Frederick.


I’m going to get busier and busier with each new site. So, over the next few weeks, I'll be working out a new schedule of taking the photos and then putting them up on this website.

And, for the second time today, my apologies for any strange gaps, under-sized type, changing fonts/typefaces and anything else that turns up. Blooger/blogspot code is once again misbehaving.

Friday, 17 November 2017

Today's pages

There's very little time available for blogging today and the internet is playing up again too. I'll put up more pages on Monday, including Singo's tower AKA the Bonython Tower.


Today's pages:

Lynn Avenue

Beane Street East



 Extra

One of the smallest sites & one of the largest in Gosford, November 2017
In the foreground, we can see one of the smallest building sites in Gosford, the expansion of a medical centre. In the background we can see one of largest, if not the very largest building site in Gosford, the Gosford Hospital site on both sides on Beane Street West and bordered by Holden Street above and Showground Road below. You can see it in the middle of this photo as a biscuit-coloured expanse of bare ground.

The large building in the top right corner of this photo is the 500-bed extension to Gosford Hospital. 500 new beds doubles the previous bed capacity of the hospital, which is the largest between Sydney and Newcastle.


Paragliding off Crackneck Point, November 2017
Paragliding off Crackneck Point in Bateau Bay on the weekend.


Paragliding off Crackneck Point, November 2017
Paragliding off Crackneck Point in Bateau Bay on the weekend.


Come back on Monday for the Bonython Tower and more.

Friday, 20 October 2017

Tiny Houses

Blue tiny house ready for its close-up, October 2017

I was lucky enough to find the tiny house site prepared for photography last week. The people who are responsible for building these tiny houses, at the corner of Showground Road and Racecourse Road in Gosford, had a professional photographer there to take photos for their website.

The site supervisor was kind enough to let me in to take my own photos (thank you very much :) ) rather than having to take them through the fence as usual, which can be tricky.

This blue tiny house faces the old Gosford High School, across Racecourse Road, and it looks lovely in its sky blue paint and with its doors open and the veranda ready to be enjoyed. Inside, we can see the kitchen and, on the right, what must be the door into the bathroom. The living area and loft bedroom must be on the left, where we can't see them.



Small but compact and liveable, October 2017

A closer photo of the inside of the blue tiny house. Small but compact and liveable.

These houses have been allotted to some of Gosford’s most needy and no doubt they’ll be very appreciative of them, especially with the cost of housing in Gosford being pushed up by housing price pressure in Sydney.

Sydney is just a fast train ride to the south of Gosford. From Gosford station to Circular Quay, on Sydney Harbour, is just 70 minutes on the commuter trains. It takes much longer, in peak hour, than that to drive from one part of Sydney to another.



Unfinished interior of the yellow tiny house, October 2017

Work is still underway on the other 3 tiny houses on the site.


Work on unfinished ramp into Common Room, October 2017

The ramp leading up into the Common Room, in the middle of the site, is still being worked on.

The main reason these tiny houses are being built at a fairly slow pace is that they’re being used to teach construction skills to some of the unemployed in Gosford.



Today's other pages:

Singo's Bonython Tower (still speedy)
Kendall Street (going gangbusters)


Come back next week for more updates on the rapid changes in my little home town.