Basement construction is going well, October 2017 |
A good pace of work is being kept up in the basement of this apartment tower.
Concrete truck, worker & crane, October 2017 |
The concrete truck is back and being put through its paces again.
Stacks of formply waiting, October 2017 |
Stacks of formply ready and waiting to be used. Stacked up materials don’t stay stacked up long on this site either. They’re put to use pretty quickly. So far, this is one of the faster moving building sites in Gosford.
All purpose bag used by crane operator, October 2017 |
These all-purpose bags are used on the building sites to move fiddly bits of rubbish and rubble out of different areas of the site, to fill up with dry materials to move into the site and to fill up with sand and use as weights stacked on construction that needs to be weighted for whatever reason.
The workers on the ground, and sometimes on the back of trucks,
load them up, the crane operator lowers his hook so the workers can put it
through the handles of the bag then they stand back and he raises the hook,
swings the crane’s arm around and lowers the bag to a spot on the site where
two or three other workers are waiting to guide it into position.
Sold out
Kendall Street site sold out already, October 2017 |
This site is already sold out and they haven’t even broken ground yet. In the photo below you can see why.
Kendall Street’s view, October 2017 |
This view is why the site in the photo above has sold out even though they haven’t started building. That is a million dollar view, over the football stadium and down the length of Brisbane Water to Lion Island and northern Sydney.
Other pages today:
Come back next week for more building site watching in this tiny town in which I live. Or sign up for email alerts in the sidebar --->
No comments:
Post a Comment
Be nice.